How Do You Install Solar Panels? Easy Steps for Installing Solar Panels
Solar Panels
If you want to Install Solar Panels & don't know how to install solar panels, then this article is for you, it is a mention proper guide on how to install solar panels

When considering a versatile energy source, you should think about solar panels. In an individual home, 3 to 4 panels can be installed easily on the rooftop. Let us discuss the different factors to be considered for installing solar panels and the steps involved.

Select the Location

The most crucial factor is to select the location of the installation of the solar panels. Make sure the place is shadow-free on the roof. When installing the solar panel on the top, there should not be any shadow from the nearby trees, water tanks, mobile towers, staircase rooms, or adjacent houses. Though it may be a shadow-free zone through the naked eye, ensure there remains no obstruction throughout the year.

Select the Angle

It would help if you decided on the angle at which the solar panels will be installed. The pitch should be such that the solar radiation is received at maximum through it. The tilt should equal the latitude of the location where energy generation is maximum and effective.

Electrical Wiring and Inverter Installation

One positive cable gets connected with one negative cable of the next panel, and the series gets created. The solar panels in St Petersburg, FL, are easy to install and will last several years without any damage. Depending on the inverter’s capacity and the project, different strings are connected and developed in parallel. All DC cable connections are connected through the MC4 connectors, which are crimped through the crimping tool. The DC wiring needs to be done because if the relationships remain loose, there remain high chances of short circuits and electric shock.

Lightning Protection

DC components are provided by earthing, and separate AC cables provide the AC components. Maintenance-free earthing kits are used for creating the earthing grid. During the day, there should be no casting of shadows on the panels. The earthing grid needs to be connected with a cable of 16 sq mm or higher than that.

Solar System Commissioning

When the energy meter is replaced with the net meter, the system gets ready for energy generation and charging. The AC connection’s phase sequence and the DC strings’ output voltage should be checked adequately before the inverter is started. The digital display of the monitor will show the basic parameters of the voltage and all the other parameters that prove that the system is functioning correctly. The inverter is then connected to a Wi-Fi signal available in a location of the signal depending upon the single-based dongle. For real-time monitoring, an internet connection will also be required.

Conclusion

Summarizing the entire article, it is clear that when you are up for a solar installation, you should do proper planning and execution. The first stages include deciding the location and the angle of placement of the panels. You should call a professional team that will handle all the electrical components and connects them through the energy generated from the discussions.

Recent Posts

More
articles